Route 4 Bridge Replacement – Woodstock, VT

For this project, H.B. Fleming was called upon at last minute to help design and build a work trestle for one of its best clients. The trestle needed to be designed to support a 230 ton crane, while it picked precast concrete beams weighing 60,000 lbs. The clients original plan was to build a ledge causeway into the river however, environmental issues that came up made this impossible. H.B. Fleming quickly designed the trestle and mobilized quickly to keep the project on track with its tight schedule.