IDEXX Laboratories Expansion

Owner: IDEXX Laboratories Partner: PC Construction  Location: Westbrook, Maine Project Overview:  Drove (239) HP12x53 & HP10x42 piles to support the new building expansion pile cap & grade beam foundation. Utilized our RTG 19T rig to initially install the piles to bedrock. Drove all bearing piles to their ultimate capacities with a diesel impact hammer.

Conley Freight Terminal

Owner: Massachusetts Port Authority Partner: SPS New England Location: Boston, Massachusetts Project Overview: Drove (36) 30” OD x 1” thick pipe piles, mainly from a barge, to construct the bridge foundations spanning the Reserved Channel. Installed (18) 20” diameter pipe piles for the new bridge abutments on each side of the Reserved Channel. Constructed various excavation support structures…